In This Section

Cater Water

Job Name:

CATER WATER TREATMENT PLANT: Improvements Project

Location: SANTA BARBARA, CA

Description of Job:

Several important improvements were constructed as part of the $14 million dollar, 37 mgd Cater Water Treatment Plant Improvements Project. Major process improvements were made to the flash mix system; new flocculators and baffle system; newly engineered filter Underdrains; filter to waste system; new filter backwash pump station; new solids recovery basins; and extensive underground pipe lines were set in place. A new Operations Annex building was also constructed. The new Annex building houses the plants new chemical feed systems, stand by generator, electrical switchgear and distribution equipment. Site construction included new parking, roadways, irrigation and extensive landscaping.

IMG_0897 IMG_0355
IMG_0563
IMG_0375
IMG_0139 IMG_053002
IMG_0751
IMG_1075 IMG_0910
IMG_085702
IMG_0888
IMG_0526 IMG_1084

Back to Top

CUSHMAN CONTRACTING COMPANY

P.O. Box 147, Goleta, CA 93116-0147 - (805) 964-8661

Site Design by: The Writing Shop